Gas Fired Boiler – Hotel
Facility
Hot Water Boiler servicing major hotel
Location
New England, U.S.
Equipment
Cleaver Brooks Gas-Fired Package Boiler providing hot water to guest rooms
Conditions
Late-spring normal load on hotel facility demand
Savings
Boiler run time reduction was normalized to 9.2 percent. Assuming natural gas @$1.40/CCF, even a 5 percentĀ savings would equate to $14k/year. The 9.2 percent savings equates to an annualized saving of $25k/year.